Skip to content
Mr. Posthole

FAQ

Posthole drilling questions, answered

The short version: the drilling minimum is $350 near Fowlerville, and the price depends on how many holes you need, how wide and how deep. Kirk files MISS DIG for you; allow about three business days for it to clear. Composite mats protect your lawn. We're insured, work year-round, and drill 6 to 24 inch holes up to 10 feet deep.

All questions

Will you damage my yard or lawn?

No. We pride ourselves on disturbing your existing lawn as little as possible. We use fiberglass composite mats to move our equipment across finished lawns, driveways and sidewalks and, more importantly, to turn our machine on your finished lawn. The mats let the machine spin in its own length on top of the mat with little to no disturbance to your property.

Ground mats laid from the sidewalk across a new front lawn
“Kirk and his team installed 20 post holes in some tight spaces for a new side yard fence in less than 3 hours. They cleaned up the spoils beautifully and left my existing grass unharmed. All for a price that I thought was very reasonable for the job.”
Peter Hill · Google review

How much will my postholes cost?

Every job is a little different. The price depends on how many holes you need, how wide and how deep. The drilling minimum is $350 in the Fowlerville and Howell area, $400 in the Lansing area and $500 in the Detroit area. Other areas are priced by distance. Most deck and fence projects run $350–$450. Fill out the contact form and Kirk will give you an accurate estimate. See pricing and minimums

How soon can you come out?

Most projects are planned, so figure about three business days. Kirk files a MISS DIG ticket for every job, and MISS DIG needs 72 business hours (Mon–Fri) to clear: A ticket submitted Friday at noon clears the following Wednesday at noon. He doesn't drill without clearance.

Do you handle the MISS DIG ticket?

Yes. Kirk files the MISS DIG ticket himself, through his contractor portal, for every job, commercial and residential. It's required by law and protects valuable infrastructure, and he doesn't drill without clearance. MISS DIG needs 72 business hours (Mon–Fri) to clear. A ticket submitted Friday at noon clears the following Wednesday at noon.

What size holes can you drill?

We run 8 auger sizes: 6, 8, 9, 12, 15, 16, 18 and 24 inches. The deepest we drill is 10 feet. Footings in Saline went the full ten feet, 18 inches wide, to reach undisturbed soil.

A tape measure down a freshly drilled hole
“Kirk did an excellent job drilling our post holes! Even with concrete trash in the ground … Deepest hole was 10 feet down!!!”
Bernd Edelmann · Google review

Will your machine fit into my backyard?

It needs a 42 inch gate. If your gate is narrower, fence sections can be removed for access. Tell us about the access when you call and we'll plan around it.

The machine on mats in the side yard between two houses, the landscaping untouched

Do you work in winter?

Yes. We work year-round, frozen ground included. Our photos include deck holes drilled in the snow in Brighton, and one customer watched us finish a job with a foot of frost in the ground. Ground screws are a good fit for winter builds because there's no concrete to cure.

Machine with auger working in the snow next to a house in Brighton, MI
“Kirk did an amazing job. He showed up on time and completed the job even with a foot of frost in the ground. His machinery is compact and was able to get into the tight space we had to work with without any damage to the surrounding concrete. His auger uses LED leveling indicators to ensure that all holes were perfectly straight. I highly recommend him.”
Michael Chosid · Google review

Is your work guaranteed?

Yes. If a hole isn't plumb or to depth, Kirk redrills it free.

Are you insured?

Yes. Any type of excavating, which hole augering is, can be dangerous: hauling, loading, unloading and operating equipment all carry real risk. We carry general liability and workers' comp, and a certificate of insurance is available on request. Don't hire a contractor who isn't insured: doing so causes you to assume their liability.

Can you help with my project layout?

Yes. Kirk does layouts for fences and straightforward decks, quoted separately. Complex decks usually come laid out by the builder. Final approval is the customer's responsibility, and we assume no liability for building code compliance.

What areas do you serve?

We serve Livingston, Ingham, Washtenaw, Oakland, Wayne, Genesee and Jackson counties in southeast Michigan, from our home base in Fowlerville. We regularly work in Fowlerville, Howell, Brighton, Lansing, Ann Arbor, Fenton, Flint, Southfield, Detroit and Downriver. Farther from Fowlerville the minimum goes up, so reach out and we'll tell you where you stand. See the service area

How is Mr. Posthole different from other posthole drilling services?

Our professionalism aside, our equipment and attention to your project set us apart. We use an LED inclinometer to make sure your holes are perfectly plumb and vertical regardless of terrain, which is essential for a well-built finished product. And our use of ground protection and dedication to preserving your property are unmatched. Your project and property are our number one priority.

What's your minimum charge?

For drilling, $350 in the Fowlerville and Howell area, $400 in the Lansing area and $500 in the Detroit area. Other areas are priced by distance. Dig and set, concrete piers and ground screw installation each have a $600 minimum.

Can you drill just one hole, like for a mailbox post?

Yes. A single hole is $250 when Kirk is already working nearby. Otherwise the minimum applies.

What sets the price?

The depth, diameter and number of holes, and where the project is. Most deck and fence projects run $350–$450. Call or text with those details and Kirk will give you a number.

What happens to the dirt?

We can remove the spoils from drilling. Haul-away starts at $350, or we can move the dirt wherever you want it on the property.

How deep do deck footings need to be?

Below the frost line and down to undisturbed soil. Next to a basement, the soil along the foundation was dug out and backfilled when the house was built (the over-dig area), so footings there often need to go 7 to 10 feet. We can drill up to 10 feet in most soil conditions, straight, right next to the foundation.

Do you leave open holes behind?

No. We cover the holes for safety, and we keep the machine and spoils inside the build area whenever the site allows.

Do ground screws need an inspection?

In most municipalities we work in, there's no inspection for ground screws. The building department accepts the engineering report, tributary load calculations and torque report. In Livingston County, an inspector comes out to watch one screw go in, and we schedule that for you. We'll help you figure out what your project needs.

Can you install ground screws in winter?

Yes. There's no concrete to pour or cure, so ground screws go in on frozen ground. That makes them a good fit for winter deck builds, and the structure is buildable immediately.

What do I need to send you for ground screws?

Your plans, through the contact form. Kirk picks the right screws for your loads and sends an estimate. When you're ready, he provides the tributary load calculations, a drawing that calls out each pier, ICC-ES ESR-4226 and the other documents for your building permit application, then installs and gives you the torque report.

How do you know each screw will hold?

Torque. As each screw goes in, its torque is recorded by a hub that connects by Bluetooth to an app on Kirk's phone. If a screw reaches its minimum torque, it bears its rated load. Every screw is logged by pier number in the torque report.

Do ground screws need concrete?

No. A ground screw goes into the ground in place of a dug-and-poured footing, so there's no concrete, no cure time and no hole spoils. The posts stay out of the ground.

What do ground screws cost?

Ground screws: $149–$210 per screw, including the screw, flange and hardware. Installation: $75 per screw, with a $600 minimum installation charge. Every ground screw installation includes tributary load calculations, a permit drawing calling out each pier, ICC-ES ESR-4226 and the other documents for your permit application, and a torque report after installation.

What do concrete piers cost?

Concrete piers are priced per pier: 8 in pier: $80; 10 in pier: $90; 12 in pier: $110; larger than 12 in: contact us for pricing. We dig, supply and pour the concrete, and set your brackets or J-hooks; you supply the brackets or J-hooks, and Sonotube forms if you want them. Prices are for standard 42-inch-deep piers. Deeper piers, like footings next to a foundation, are quoted. Concrete pier jobs have a $600 minimum.

What does post setting cost?

Dig-and-set jobs get a reduced drilling fee, plus a per-post setting charge: $50 for a 4x4 fence post (8 in hole); $80 for a 4x4 post for gates or fences over 7' (10 in hole); $60 for a 6x6 fence post (10 in hole); $90 for a 6x6 post for gates or fences over 7' (12 in hole). You supply the posts; we supply the concrete. Dig-and-set jobs have a $600 minimum.

Do you supply the posts?

No. You supply the posts. We supply the concrete, set each post plumb and in line, and you build.

Is the drilling included in the post setting price?

Dig-and-set jobs get a reduced drilling fee, plus the per-post setting charge, with a $600 minimum. Setting posts takes an extra person, the mixer, a run for materials, and often a second trip to set after the hole inspection.

Do you haul the old concrete away?

Yes. We remove and dispose of the concrete and any other debris you need cleared for your project, then drill the postholes.

Do you tear out old decks?

Yes. We remove the old deck and haul the debris, and the same crew can drill the footing holes for the new one.

Can you take out my old fence and put in the new posts?

Yes. We pull the old fence, cut out old posts set in concrete, haul it all away, drill the new holes and can set the new posts.

Do you do concrete removal as a standalone job?

Yes. Concrete removal doesn't have to come with postholes. We break it out and haul it away.

Can you pour the concrete footings too?

Yes. Kirk has a concrete mixer that mounts on the front of the mini skid, so we can drill the footing holes and fill them with concrete.

Question not here?

Call or text (517) 715-9064. Mon–Sat 7am–7pm.