Skip to content
Mr. Posthole

Saline, MI · March 2026

10 ft deep, 18 in wide footings in Saline

In March 2026 Mr. Posthole drilled deck footings ten feet deep and 18 inches wide at a new house in Saline, Michigan, for one of our contractors. Footings belong on undisturbed soil, and on this lot that meant going ten feet down. Every hole was delivered accurate and on time.

Track machine drilling an 18-inch footing beside a new house in Saline, MI, with hole locations marked in orange paint

What we did

Per code (and common sense), footings should be installed down to undisturbed soil. These footings were all TEN FEET DEEP and 18" WIDE.

We can handle any posthole project you might need. These were installed for one of our many contractors and delivered accurate and on time.

3 more photos

Photos from the job

  • Auger over a ten-foot-deep footing hole at a new house in Saline, MI
  • Auger drive lettered with Mr. Posthole's phone number on the Saline, MI footing job
  • The muddy Saline, MI site with footing holes drilled inside the orange paint marks

Tell us about your holes.

How many, how wide, how deep, and where. Kirk will text or call you back with a quote. Mon–Sat 7am–7pm.